1
/
of
6
Pawadiz
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)
Regular price
$32.00 USD
Regular price
Sale price
$32.00 USD
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Features:
- Dog Training Leash : Elevate your dog's recall skills with our dog waterproof leash. Ideal for outdoor activities like hiking, camping, and beach play, it fosters better obedience and a closer bond.
- Weatherproof Durability : Crafted from PVC coated nylon webbing, our dog waterproof leash remains lightweight and strong even when wet. It's weatherproof, easy to clean, anti-odor and perfect for all conditions.
- Strong and Soft leash : Experience a leash that's both strong and gentle. With a remarkable 600 lbs pull force resistance, it offers safety and comfort in various weather conditions.
- Adventure Ready: Designed for active outdoor moments, our dog leash stands up to play, training, and exploration. It's a reliable companion for all your escapades.
- Multi color and size: We provide different colors to choose from width 3/5 inch with length 5FT /10FT /15FT /30FT/ 50FT. Find the perfect fit for your dog's needs and your preferences.
model number: dog leash
Part Number: 01
Details: Nimble Waterproof Dog Leash Durable PVC Great for Small Medium Large Dog Training Leash
EAN: 0884710642978
Package Dimensions: 7.7 x 7.3 x 0.8 inches
Share
![Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)](http://www.pawadiz.com/cdn/shop/files/51TfhC7BdYL.jpg?v=1718996068&width=1445)
![Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)](http://www.pawadiz.com/cdn/shop/files/517IoVvm19L.jpg?v=1718996068&width=1445)
![Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)](http://www.pawadiz.com/cdn/shop/files/61MjqqUT5LL.jpg?v=1718996068&width=1445)
![Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)](http://www.pawadiz.com/cdn/shop/files/41u6VWHw3vL.jpg?v=1718996068&width=1445)
![Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)](http://www.pawadiz.com/cdn/shop/files/41NUIUe6peL.jpg?v=1718996068&width=1445)
![Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)](http://www.pawadiz.com/cdn/shop/files/51UOQxJeYdL.jpg?v=1718996068&width=1445)